Booking Schedule of the
(6.0 MeV EN-Tandem, 2.5 MV Van der Graaff, Data - Acquisition Facilities)


March - 2003

Below in blue are the backed up projects.

Key
Scheduled
Run after rescheduling
Run as scheduled
Date
(scheduled)
Date
(run)
Project / Institutions Number Spokesperson / team Beam/Energy Facility / DAQ Result
Mar 3-6

Mar 3-6

Maintainance

O Pekar,
T Hollander,
E Rood



Decide to revert back to original HVE CPU configuration
(Had tried arhus 2 x CPU system). Tank briefly depresurised for modifications
Mar 7-11
Mar 7-11

Conditioning and
Beam Energy Calibration
Al(p,n)Si, 5.4MeV threshold

SH Connell,
T Hollander
O Pekar
Students
4 - 7 MeV p

Conditioning now gives correct behaviour.
Can redo calibration more accurately.
HV also more stable under regulation.
Digital readbacks reset to new calibration
Mar 12-13
Mar 12-13
Maintainance

O Pekar, T Tjebane


AMS-line detector system overhaul
Mar 14-19
Mar 14-19
Conditioning


Up to 4.9 MV

Conditioning appears successful, progress is made. Previous HV ceiling has disappeared
Mar 24-25
Mar 24-25
Thin single crystal diamond project :
Implantation - anneal and etch lift-off technique

C Levitte
(Schonland)
Sbu Mabizela
A da Costa,
D Dube, T Tjebane
SH Connell
D Rebuli
12C / 9 MeV
0o High Energy Heavy Ion Implantation beam line
Completed implant program.
HV now very stable and transmission good. Can get 1 uA scanned on target over 1cm2
Mar 26-27
Mar 26-27
uPIXE study of BOART WC samples

Sbu Mabizela
A da Costa,
D Dube, T Tjebane
SH Connell

Proton / 3.2 Mev
Tandem - 30o W beam line
Microprobe 
OMDAQ
Had to recommission uPIXE system due to long period of inaction. Tennelec Amp faulty. Took data with poor resolution with spare equipment
    Thin single crystal diamond project :
Implantation - anneal and etch lift-off technique
  C Levitte
(Schonland)
Sbu Mabizela
SH Connell
D Rebuli
E Sideras-Haddad
12C / 9 MeV 0o High Energy Heavy Ion Implantation beam line  
    Develop AMS capability - prepare for separation measurement of 13C, 14C, and 14N   Tjatje Tjebane
SH Connell. 
E Sideras-Haddad
E Rood, O Pekar, T Hollander, R Chirwa
12C5+ / 19.8 MeV

13C5+ / 19.8 MeV

Tandem - 45o E beam line.
- newly installed MS line
 
    uPIXE study of blood samples from aesophogus cancer patients   Ray
(Oncology Dept)
E Sideras-Haddad
SH Connell
Proton / 3.2 Mev Tandem - 30o W beam line
Microprobe 
OMDAQ
 
    Study of hydrogen mobility in diamond (using deuterium isotope)   A Naran
(U. Eduardo Mondlane)
SH Connell
E Sideras-Haddad
JPF Sellschop
D Rebuli
A DaCosta
M Dalton
12C / 12 MeV Tandem - 30o W beam line
Microprobe 
COLLECT-DAQ
 
    Characterisation of H, N and O distributions in growth zones of ultra-high-quality synthetic type Ia diamond   D Dube
D Rebuli
JPF Sellschop
(Schonland)
A DaCosta
SH Connell
E Sideras-Haddad
4He / 3-5 MeV Tandem - 30o W beam line
Microprobe 
OMDAQ
Develop microscopy for in situ N and O in diamond
    Radiation Damage study of Diamond Detectors   A DaCosta
(Schonland)
JPF Sellschop
SH Connell
E Sideras-Haddad
12C / 12 MeV
Proton / 3.2 MeV
Tandem - 30o W beam line
Microprobe 
OMDAQ
 

Last updated  : 4 April  2003
For queries and comments - e-mail Dr SH Connell

       Download the MS-Word booking form for the Schonland accelerator facilities.