Below in blue are the backed up projects.
Key |
Scheduled |
Run after rescheduling |
Run as scheduled |
Date
(scheduled) |
Date
(run) |
Project / Institutions | Number | Spokesperson / team | Beam/Energy | Facility / DAQ | Result |
Jan 2-22 |
Jan 2-22 |
Maintainance |
T Hollander, E Rood SH Connell |
Replace LE aqnd HE col current wirng, Re-align Stripper canal, refit rings, close tank, repressurise tank while monitoring alignment, fnal alignmnt of LE and HE beamlines, re-assemble LE and HE beamlines, Redry gass, recover all vacuums |
|||
Jan 23 |
Jan 23 |
Test Tandem |
SH Connell, O Pekar |
3.2 MeV p |
Transmission now very good, back to specs. |
||
Jan 24-30 |
Dec 12-24 |
Maintainance |
M Labuschagne O Pekar, T Hollander, E Rood |
860A ion source water leak. repair and clean source Overhaul pneumatics at Analyser Overhaul HV Terminal Stabilisation Complete installation of duo-vacuum system |
|||
Jan 31 |
Jan 31 |
Test Tandem |
SH Connell, O Pekar |
860A back in good running order, operating to specs. |
|||
Thin single crystal diamond project :
Implantation - anneal and etch lift-off technique |
C Levitte
(Schonland) Sbu Mabizela SH Connell D Rebuli E Sideras-Haddad |
12C / 9 MeV | 0o High Energy Heavy Ion Implantation beam line | ||||
Develop AMS capability - prepare for separation measurement of 13C, 14C, and 14N | Tjatje Tjebane
SH Connell. E Sideras-Haddad E Rood, O Pekar, T Hollander, R Chirwa |
12C5+
/ 19.8 MeV
13C5+ / 19.8 MeV |
Tandem - 45o
E beam line.
- newly installed MS line |
||||
uPIXE study of blood samples from aesophogus cancer patients | Ray
(Oncology Dept) E Sideras-Haddad SH Connell |
Proton / 3.2 Mev | Tandem - 30o
W beam line
Microprobe OMDAQ |
||||
Study of hydrogen mobility in diamond (using deuterium isotope) | A Naran
(U. Eduardo Mondlane) SH Connell E Sideras-Haddad JPF Sellschop D Rebuli A DaCosta M Dalton |
12C / 12 MeV | Tandem - 30o
W beam line
Microprobe COLLECT-DAQ |
||||
Characterisation of H, N and O distributions in growth zones of ultra-high-quality synthetic type Ia diamond | D Dube
D Rebuli JPF Sellschop (Schonland) A DaCosta SH Connell E Sideras-Haddad |
4He / 3-5 MeV | Tandem - 30o
W beam line
Microprobe OMDAQ |
Develop microscopy for in situ N and O in diamond | |||
Radiation Damage study of Diamond Detectors | A DaCosta
(Schonland) JPF Sellschop SH Connell E Sideras-Haddad |
12C / 12 MeV
Proton / 3.2 MeV |
Tandem - 30o
W beam line
Microprobe OMDAQ |
Last updated : 4 February
2003
For queries and comments
- e-mail Dr SH Connell
Download the MS-Word booking
form for the Schonland accelerator facilities.