Booking Schedule of the
(6.0 MeV EN-Tandem, 2.5 MV Van der Graaff, Data - Acquisition Facilities)


February - 2002
Key
Scheduled
Run after rescheduling
Run as scheduled
Date
(scheduled)
Date
(run)
Project / Institutions Number Spokesperson / team Beam/Energy Facility / DAQ Result
Feb 2-8
Feb 2-8 Set-up :
Heavy-ion Implantation beam-line
  C Levitte
E Sideras-Haddad
JPF Sellschop
SH Connell
12C / 9 MeV   Prepare sample holders, recover vacuums, test current integration, configure scanner, steerer and cameras
Feb 9-14
Feb 9-14 Thin single crystal diamond project :
Implantation - anneal and etch lift-off technique
  C Levitte
(Schonland)
E Sideras-Haddad
JPF Sellschop
SH Connell
12C / 9 MeV   Implantation carried out
Feb 15-21
 Feb 15-21  uPIXE study of biological residue on paleo-artefacts   G Langejans
(Archeology Dept)
E Sideras-Haddad
SH Connell
Proton / 3.2 Mev Tandem - 30o W beam line
Microprobe 
OMDAQ
Analyses of in-situ residues.
Feb 22-28
Feb 22-28
 Repair and maintainance   O Pekar, 
T Hollander 
E Rood 
SH Connell 
E Sideras-Haddad 
JPF Sellschop
    Renew sripper gas control rod.   Renew stripper gas control gearbox and variac. Remove stripper foils and stripper foil control rod. Repair stripper foil control. Repair water leak in tank cooling system. General check and       clean. Clean 860A ion source. Replace two pneumatic solenoid       valves, repair tank compressor.

Last updated  :  8. March.02
For queries and comments - e-mail Dr SH Connell

       Download the MS-Word booking form for the Schonland accelerator facilities.