Project / Institutions | Number | Spokesperson / team | Beam/Energy | Facility / DAQ | Result |
Apr 1-10 | Apr 1-10 | Complete maintainance | O Pekar,
T Hollander E Rood SH Connell E Sideras-Haddad JPF Sellschop |
Renew sripper gas control rod. Renew stripper gas control gearbox and variac. Remove stripper foils and stripper foil control rod. Repair stripper foil control. Repair water leak in tank cooling system. General check and clean. Clean 860A ion source. Replace two pneumatic solenoid valves, repair tank compressor. | |||
Apr 11-17 | Maintainance period extended | O Pekar,
T Hollander E Rood |
Overhaul 860ACoolanol system. Fabricate new 860A cathode insulator. Tnak filled, gas pressurised and dried | ||||
|
|||||||
Apr 11-14 | Apr 18-25 | uPIXE study of nano metallic clusters distributions in LiNiO produced by Au implantation and anneal | G Amolo
(Physics Dept) |
Li / 8 MeV | Tandem - 30o
W beam line
Microprobe OMDAQ |
|
|
Apr 15-19 | Characterisation of H, N and O distributions in growth zones of ultra-high-quality synthetic type Ia diamond | JPF Sellschop
(Schonland) A DaCosta SH Connell E Sideras-Haddad |
Proton / 3.2 MeV | Tandem - 30o
W beam line
Microprobe OMDAQ |
Samples did not arrive ....
Run rescheduled |
||
Apr 26-30 | Further developments
on HE extension implant line.
Develop scanning system Produce nano metallic clusters in LiNiO by Au implantation and anneal |
G Amolo
(Physics Dept) |
Au / 5.5 MeV | Tandem - HE ext
Implant Station |
Scanning system developed
and commisioned
Implants carried out. |
||
Apr 22-26 | Study of hydrogen mobility in diamond (using deuterium isotope) | A Naran
(U. Eduardo Mondlane) SH Connell E Sideras-Haddad JPF Sellschop D Rebuli A DaCosta M Dalton |
12C / 12 MeV | Tandem - 30o
W beam line
Microprobe COLLECT-DAQ |
Run rescheduled | ||
Apr 29-30 | Resonant electron emmission from diamond | D Rebuli
(Schonland) E Sideras-Haddad JPF Sellschop SH Connell |
12C / 12 MeV | Tandem - 30o
E "AMS" beam line
COLLECT-DAQ |
Run rescheduled |